
The design took into consideration the Haj season, which had a significant impact on the operations of the airport. The objective was to have a facility that will optimize available land for development, and to increase the capacity of airport runway systems for aircraft movement. The protocol-critical functional and operational requirements of the Royal Pavilion and Royal Annex also had to be met in a manner to allow its operations to be smooth and secure.
For More details.
No comments: